The hand tamp requires two operatives to manually tamp and drag the concrete to the finished level.
- 6.2 metre pre drilled beam
- Low cost option for levelling concrete
- Highly durable with no moving parts
- Waist height handles to minimise operator effort
- Choice of lengths to suit application
The price shown is for the 6.2m beam only.